Credit: U.S. National Science Foundation
1. If authorized as part of the total project cost.
2. During execution, contingency moves into the Performance Measurement Baseline (PMB), per change control process.
- Total Project Cost (TPC)*
- Other Direct Costs (ODC)*
- Management Reserve1 held by NSF*
- Award Amount§
- Contingency2*§
- Profit/fee1§
- Performance Measurement Baseline (PMB)3§
- Summary Level Planning Package (SLLPs)§
- Undistributed Budget (UB; activities not yet distributed to the control account)§
- Control Accounts (CA)4§
Planning Packages (PP; far-term activities within a control account)§
Work Packages (WP; near-term, detail-planned activities within a control account)§
* NSF held and managed.
§ Recipient held and managed.
1. If authorized as part of the total project cost.
2. During execution, contingency moves into the performance measurement baseline, per change control process.
3. Performance measurement baseline = CAs + UB + SLPPs = Budget at completion (BAC).
4. Control account = WP + PPs.
Components
- CA: Control Account = WPs +PPs
- MR: Management Reserve (held by NSF)
- ODC: Other Direct Costs (including service or equipment provided by others)
- PMB: Performance Measurement Baseline = CAs + UB + SLPPs = BAC
- PP: Planning Package (far-term activities within a control account)
- SLPP: Summary Level Planning Package
- TPC: Total Project Cost
- TPCNSB = Total Project Cost (NSB authorized)
- TPCAWD = Award Amount to Awardee (PMB + contingency + profit/fee)
- TPCEVM = Total Project Cost managed by Awardee (PMB + contingency)
- UB: Undistributed Budget (activities not yet distributed to control account)
- WP: Work Package (near-term, detail-planned activities within a control account)
EVM basic components
- AC = Actual Cost = ACWP = Actual Cost of Work Performed
- BAC = Budget at Completion = ∑BCWS = Sum of Budgeted Cost for Work Scheduled
- EAC = Estimate at Completion = ACWP + ETC
- ETC = Estimated Cost of Work Remaining (WR)
- EV = Earned Value = BCWP = Budgeted Cost for Work Performed
- PV = Planned Value = BCWS = Budgeted Cost for Work Scheduled
At start of construction stage
During construction stage
Notes
1 If authorized as part of TPC.
2 During execution, contingency moves into the PMB per change control process.
3 Favorable > 0, Unfavorable < 0.